Search found 5 matches

by BowlingSuperior
Wed Nov 01, 2017 7:01 am
Forum: MegaShift Transmission Application
Topic: Sheriff left town?
Replies: 5
Views: 33699

Re: Sheriff left town?

Lance is not gone, he is just taking a (well-deserved) break to do whatever he needs (or wants) to do. He deserves the time - everyone needs a breather. Right now the code is stable and tested and there is an incredible amount of user-documentation on the web to get anyone running. So the project &q...
by BowlingSuperior
Fri Mar 07, 2014 12:09 pm
Forum: MegaShift Transmission Application
Topic: microTCU
Replies: 45
Views: 161253

Re: microTCU

Let me chime in here... the MicroTCU should be available the end of spring beginning of summer, with all things being in place. I just need to do a final test of the overall system and make sure the harness, etc are stocked up and ready to go. I know its been a long time coming for this, and there h...
by BowlingSuperior
Tue Jan 06, 2009 6:30 pm
Forum: MegaShift Transmission Application
Topic: 4L80E code
Replies: 156
Views: 171686

Re: 4L80E code

The GPIO board won't be released for production until existing beta testers (there are several) report back on success, or any of their hardware/software issues are understood and fixed. So far, most of the beta testers have not reported anything back at all (the beta units were sent out in Septemb...
by BowlingSuperior
Tue Dec 23, 2008 11:45 am
Forum: GPIO Assembly
Topic: Cost??
Replies: 13
Views: 24293

Re: Cost??

We have not worked out final cost for the GPIO. Probably around $160.00 or thereabouts for the PCB and connector. The ampseal is the pricey part, as is getting the harness wires sourced and crimped. Like everything else, we will try to keep this price rock-bottom as much as possible....

- Bruce
by BowlingSuperior
Fri May 02, 2008 9:59 am
Forum: GPIO Assembly
Topic: GPIO being made up at CM right now...
Replies: 11
Views: 21455

GPIO being made up at CM right now...

As of right now (May 2, noon EST) 100 GPIO boards are making their way down the contract assembly line for SMT assembly! I should have these in-hand by the end of next week, I will then blast in a bootloader and check them out. t which point the first boards will be available :)

- Bruce